Is there a way to change order of galleries?
Janelle
Registered Users Posts: 104 Major grins
Right now the order of the galleries in my Portfolio is ordered in the order of most recent change made to the gallery, but I would rather have more control over the order of the galleries in that section. This is going to be a static page (other than adding photos to each gallery.) I won't be adding more galleries under that section.
If there is a way for me to manually move the galleries around, could someone tell me the html/css code for it and where to put it? I know nothing about CSS - you guys pretty much built my site from your answers to previous questions.
Thanks!
www.janellerodgers.smugmug.com
If there is a way for me to manually move the galleries around, could someone tell me the html/css code for it and where to put it? I know nothing about CSS - you guys pretty much built my site from your answers to previous questions.
Thanks!
www.janellerodgers.smugmug.com
0
Comments
and gallery pages and when toggled arrange in any order you like.
Make sure in gallery customization "arange by position" is checked.
Al
My Website index | My Blog
I can see how to rearrange photos and have checked "arrange by position" on my gallery tools page. What I can't figure out is where the control is to change the order of my galleries in my sub-category page. Please point me in the right direction to find this.
Bump for purpose of trying to get this question answered. Here's a more complete description.
I have a sub-category for a recent trip to S. Utah and the Grand canyon. I posted all the galleries in order. I assigned a number and day of the week to the title of the galleries to assist viewers if they wanted to see the entire trip in order.
Recently, I went in and added one more photo to my first gallery. That booted it to the last position rather than the first. I want to put it back in order and I can't figure out how to do that on the sub-category page where all the galleries in that trip are displayed. Where is the control panel to do this?
Thanks,
Rafa
or galleries box.
sort galleries: arrange
sort sub-categories: arrange
sort categories by: most recent · position (arrange)
My Website index | My Blog
Hi, Rafa. I'll give it a try of explaining it to you if you haven't figured it out yet. I don't know why this was so perplexing to me, but it took me a long time to identify where to find this tool.
I have my galleries set to display on my homepage. When I click on my homepage and I'm logged into my account, inside the larger box that holds all my gallery categories on the top left corner it says "gallery categories" and directly below that it says "sort categories by: most recent · position (arrange)"
That's where you click on ARRANGE and it give you the toggles to move your galleries to the position you want them in. Make sure you go back to that toggle box and click "save changes" before you go to a new page.
If you click into any of your categories you get the message in the same position to "sort sub-categories: arrange"
I hope that helps.